自动搅拌一体车运输砂浆水泥混合物过程中,一直在转动泵车泵罐,这样会不会导致砂浆水泥混凝土由于转动存在搅拌,边运输边搅拌,会不会造成搅拌时间过长,造成水泥砂浆搅拌时间过长,形成水泥砂浆分离现象,影响砂浆水泥使用性能?
In the process of transporting mortar and cement mixture by the automatic mixer truck, the pump tank of the pump truck has been rotating all the time. In this way, will the mixing time of mortar cement concrete be too long due to mixing while transporting due to the rotation of mortar? Will the mixing time be too long, resulting in the phenomenon of cement mortar separation and affecting the performance of mortar cement?
自动搅拌一体车运输砂浆水泥混凝土,从搅拌站出发建筑施工场合需要一定时间。另外,运输在建筑施工场合,还需要等待时间,并不能保证,混凝土搅拌车运送施工地点立刻就卸车使用。这期间,时间差会造成砂浆水泥混凝土在原本搅拌均匀佳状态情况下,过度搅拌,造成水泥砂浆分离。
It takes a certain time from the mixing station to the construction site to transport mortar and cement concrete by the automatic mixer truck. In addition, transportation in the construction site, also need to wait for time, can not guarantee that the concrete mixer truck to the construction site immediately unloaded for use. During this period, the time difference will cause the mortar cement concrete in the original well mixed condition, excessive mixing, resulting in cement mortar separation.
自动搅拌一体车,搅拌砂浆水泥混凝土过程中已经考虑到运输时间,根据搅拌车运输路途时间长短,预算运输转动搅拌时间加等待卸车时间。泵车内混凝土砂浆状态刚好在搅拌时间过程中,呈现佳使用状态。
The transportation time has been considered in the process of mixing mortar and cement concrete with automatic mixer. According to the length of transportation road of mixer truck, the transportation rotation mixing time and waiting unloading time are estimated. The state of concrete mortar in the pump truck is just in the process of mixing time, showing a good use state.
这是一整套严格经过时间预算以及自动搅拌一体车状态实验得出运输使用作业方案。
This is a complete set of strict time budget and automatic mixing vehicle state experiment to obtain the transportation operation plan.